Demolition starts!





Demolition has finally started!




















First the entrance to the site was widened to make a more sweeping driveway round the front.




The clay roof tiles were removed to be reclaimed, while the inside was stripped out. One of the demolition guys took the old boiler.




The lounge. Floorboards on sleeper walls over earth.
Hillcroft v2 will have a bit more floor insulation.




The big container skip is for waste wood.
Everything is being sorted on site
.





 














One big rubbish pile, but the other piles are all sorted for some sort of recycling.
They're sorting the bricks for reclamation too.




Remains of the mural...